First version of import from Naviate into Nettdok are now completed in version 2.0.1032, 2025.01.27.

Below some snapshots and comments from the execution that gives a overview over the prosess:

hmtoggle_plus1Starting with a drawing containing a power feeder and a distribution board

Import_from-Naviate-pic1

hmtoggle_plus1Exchange data with Naviate function

Import_from-Naviate-pic2

hmtoggle_plus1Select exported file from Naviate

Import_from-Naviate-pic3

First import requires mapping of cables, protective devices and load symbols. All mappings are stored and can be reused in other projects. Mapping can also be stored for different protection producers (ABB, Siemens, Schneider, GE ...)

hmtoggle_plus1Mapping of cables

Every cable spec. in the exported file from Naviatehas to be mapped to a cable in Nettdok

Import_from-Naviate-pic4

Import_from-Naviate-pic5

hmtoggle_plus1Mapping of protection devices

Every protection device spec. in the exported file from Naviate has to be mapped to a protection device in Nettdok

Import_from-Naviate-pic6

Import_from-Naviate-pic7

hmtoggle_plus1Mapping of load types to load symbols

Load type symbols gives important visual information in the single line schema:

Import_from-Naviate-pic9

Selected load symbols in the drawing:

Import_from-Naviate-pic18

hmtoggle_plus1Selecting what to import

Before import can start:
- distribution board to import has to be selected
- start position for first circuit must be determed
- model for distribution circuits has to be selected
- visibility for distribution board references has to be determed

Import_from-Naviate-pic11

 
Selecting model for distribution circuit

Import_from-Naviate-pic12

 
Show REF3 for all distribution boards is set
model 01 is selected for thedistribution circuit
Start position for first circuit is set to 5:

Import_from-Naviate-pic13

hmtoggle_plus1Starting import

After
- import data is checked and found Ok
- all cables are mapped
- all protection devices are mapped
- all load symbols are specified
- distribution board to import are selected
import can start:

Import_from-Naviate-pic14

hmtoggle_plus1Import completed

After import completed: Status field shows imported distribution boards and their downstream circuits sorted on circuit number:

Import_from-Naviate-pic15

 
Page 1: Generated single line schema for distribution board Main distribution board:

Import_from-Naviate-pic16

 
Generated single line schema for distribution board Sub distribution board:

Import_from-Naviate-pic17